CM-13: Formal Change Management Methodology
Documented formal change management methodology for computerized information systems and related technology
Control Description
The Company has documented a formal change management methodology that governs the design, acquisition, implementation, configuration, modification, and management of computerized information systems and related technology, including related hardware/infrastructure for the in-scope applications and related databases.
Plain Meaning
Our organization must have a written, formal process that explains how to handle all changes to our computer systems, software, hardware, and infrastructure. This document should cover everything from planning and designing changes to implementing them and managing them afterward. It ensures everyone follows the same process and nothing gets missed when making changes.
Implementation
Comprehensive Change Management Documentation
1. Change Management Policy Document
# Change Management Policy
## 1. Purpose and Scope
This document establishes the formal change management methodology for all computerized information systems, applications, databases, infrastructure, and related technology within [Company Name].
### 1.1 Scope
- All production applications and databases
- Infrastructure components (servers, networks, storage)
- Configuration changes
- Security updates and patches
- Third-party integrations
- Development and testing environments
### 1.2 Objectives
- Minimize risk and disruption to business operations
- Ensure changes are properly planned, tested, and approved
- Maintain system stability and security
- Provide audit trail for all changes
- Enable rapid response to critical issues
## 2. Change Management Process
### 2.1 Change Request Submission
All changes must be submitted through the formal change request process:
1. **Change Request Form**: Complete the standardized change request form
2. **Impact Assessment**: Evaluate potential impact on systems and business
3. **Risk Assessment**: Identify and assess potential risks
4. **Resource Requirements**: Determine personnel, time, and infrastructure needs
5. **Rollback Plan**: Define how to revert changes if needed
### 2.2 Change Classification
#### Emergency Changes
- Critical security patches
- System outages requiring immediate resolution
- Regulatory compliance deadlines
- Security incidents
#### Standard Changes
- Routine maintenance
- Planned feature releases
- Configuration updates
- Performance optimizations
#### Major Changes
- New system implementations
- Major version upgrades
- Infrastructure migrations
- Significant architectural changes
### 2.3 Approval Workflow
#### Standard Changes
1. Technical Lead Review
2. Security Team Review (if applicable)
3. Change Advisory Board (CAB) Review
4. Management Approval
#### Major Changes
1. Technical Lead Review
2. Security Team Review
3. Architecture Review
4. Change Advisory Board (CAB) Review
5. Management Approval
6. Executive Approval (if required)
#### Emergency Changes
1. Immediate Technical Lead Approval
2. Post-implementation CAB review
3. Management notification
## 3. Implementation Standards
### 3.1 Development Workflow
#### Phase 1: Planning and Design
- **Product Team Scope Preparation**: Product team defines requirements and scope
- **Design Phase**: Providing design specifications for sprint planning
- **Sprint Planning**: Development team estimates and plans implementation
#### Phase 2: Development and Testing
- **Implementation**: Development team starts coding while QA team writes test cases
- **QA Testing**: QA team tests implementation in development environment
- **E2E Test Development**: QA creates end-to-end test cases for new functionality
- **Regression Testing**: QA runs E2E tests on previously completed functionality to ensure no regressions
- **Bug Fixes**: Development team addresses issues found during testing in development environment
#### Phase 3: Demo and Approval
- **Demo Environment Deployment**: Code is deployed to demo environment
- **Product Team Review**: Product team reviews and requests additional changes if needed
- **E2E Testing**: Full end-to-end test suite is executed in demo environment
- **Multi-Team Approval**: Production deployment requires approval from:
- Team Lead
- QA Team
- Product Team
- Successful E2E test execution in demo environment
#### Phase 4: Production Deployment
- **Production Update**: Only after all approvals and successful demo E2E testing
- **Post-Deployment Verification**: Monitoring and validation in production
### 3.2 Development Standards
- Code review requirements
- Documentation requirements
- Version control procedures
- Branch management and merge policies
### 3.3 Deployment Standards
- Environment promotion process (Dev → Demo → Production)
- Deployment verification steps
- Rollback procedures
- Monitoring and alerting
### 3.4 Configuration Management
- Configuration version control
- Environment-specific configurations
- Secret management
- Infrastructure as Code (IaC)
## 4. Testing Requirements
### 4.1 Security Testing
- **Pre-commit Security Scanning**: Automated security checks before code commits
- **Development Phase Security Testing**:
- Static Application Security Testing (SAST)
- Dependency vulnerability scanning
- Security code review
- **Pre-deployment Security Testing**:
- Dynamic Application Security Testing (DAST)
- Vulnerability scanning
- Penetration testing (for major changes)
### 4.2 Unit Testing
- Automated test execution
- Test result validation
- Code coverage requirements
### 4.3 Manual Testing
- **Exploratory Testing**: Manual testing to discover edge cases and unexpected behaviors
- **Usability Testing**: Manual validation of user experience and interface design
- **Ad-hoc Testing**: Unscripted testing based on tester experience and intuition
- **Cross-Browser Manual Testing**: Manual verification across different browsers and devices
- **Mobile Device Testing**: Manual testing on various mobile devices and screen sizes
### 4.4 End-to-End (E2E) Testing
- **Regression Testing**: E2E tests for existing functionality to prevent regressions
- **New Functionality Testing**: E2E tests for all new features
### 4.5 User Acceptance Testing
- Business requirement validation
- User interface testing
- Accessibility testing
## 5. Documentation Requirements
### 5.1 Technical Documentation
- Architecture diagrams
- OpenAPI documentation
- Configuration guides
### 5.2 Operational Documentation
// ...
### 5.3 User Documentation
- User manuals
- Training materials
- Release notes
## 6. Monitoring and Review
### 6.1 Post-Implementation Review
- Performance metrics
- Error rates
- User feedback
- Business impact assessment
### 6.2 Change Success Metrics
- Deployment success rate
- Rollback frequency
- Incident rate post-change
- User satisfaction scores
## 7. Compliance and Audit
### 7.1 Audit Trail
- All changes logged and tracked
- Approval records maintained
- Implementation evidence preserved
- Rollback records documented
### 7.2 Regulatory Compliance
- SOC 2 compliance requirements
- Industry-specific regulations
- Data protection requirements
- Security standards complianceRelated Links
Tools and Automation
CM-12: Management Approval for Production Changes
Management approval required for all changes to production environment including application, database, infrastructure, and configuration
CM-15: Data De-identification for Non-Production Environments
De-identification of confidential data before use in non-production environments